Home | About Us | King-gem Stones | Sculpture| NewsEngineering Case | Contact | 中文版     
● News More >>
  ·news  
 
Engineering Case
Question
Installation Guide
Product Menu
    + Castle Stone
    + Pebble Stone
    + Mortar Stone
    + Cobblestone
    + Field Stone
    + Volcano Stone
    + Reef Stone
    + Ledge Stone
    + Sandy Stone
    + Mushroom Stone
    + Texture Stone
    + Nanshan Stone
    + Scattered Stone
    + Rock Stone
    + Fossil Stone
    + Lime Stone
    + Stream Stone
    + Linearity Stone
    + Brick Stone
    + Paving Stone
    + Still Stone
    + Key Stone
    + Cap Stone
    + Fireplace Stone
    + Window and Door Trim Molding
    + Corner Stone
 
Home>King-gem stone>Installation     



1.Clean and trim the surface,mix the morter standby.
   (Suggest to use bond made from King-Gem Stones)
~

2.Put the culture stone on the ground spread out with the most reasonable aesthetic effect,then choose to fix.

 

 

 

3.Covarage must be completed between the mortar bad and back surface of the stone.

 

 

 

4.Select to install the comer pieces first.

 

 

 

5.Appty the flat pieces toward the wall center base on the comer pieces.

 

 

 

6.Position alrge first,then trim and fit the smaller pieces.

 

 

 

 

7.You can use tools to trim the edge and adjust the size when install.

 


8.Need to press each stone into the mortar seting bed tirmly enough to ensure a good bond after finished all the install,the finished job should
be broomed or brushed to remove loose mortar and to clean the face of the stone.

  Copyrights © 金吉马雕塑文化发展有限公司All rights Reserved.Powered By:www.ykrx.com